Cadell Orchards
- 4.8 MW solar
- 4.2 MWh storage
- 7 km HV
- 20-yr PPA
No viable grid connection. Diesel irrigation replaced, with diesel use down around 85%.
AGL project pageBehind-the-meter microgrids for large energy users across regional Australia. Solar, storage and firm generation, supplied under long-term power purchase agreements.
We originate directly with customers, model the site against its real load, structure the contract, and stay with the asset for its life.
Anyone can quote a solar array. The difficulty is proving what a system will do on the worst week of the year, and then pricing twenty years of energy against that answer with enough confidence to sign.
Orpheus is the modelling and dispatch engine we built to do exactly that. It is why our feasibility studies convert, why our projects land close to budget, and why the contract we sign is one we can stand behind.
Load profiles, solar and weather data, tariffs, equipment specifications and operating constraints run through an energy algorithm at interval resolution. The resulting energy balance feeds directly into capex, opex, PPA terms, funding and tax — so system design and commercial outcome are solved together rather than in sequence.
Day-ahead and intra-day setpoint schedules for generation, storage and load. An optimisation algorithm is solved over a rolling horizon and re-solved as load, weather and prices move, balancing energy cost, demand charges, fuel use and asset life against every physical and contractual limit on the site. Schedules are executed by the site control system, with protection and islanding staying where they belong.
The engine that priced the contract also runs the asset and reconciles delivered performance against it. Contracted outcomes get measured, not assumed — and every site that operates sharpens the forecast applied to the next one.
A day on an irrigated orchard microgrid at around 85% renewable penetration. Solar carries the pumping load, storage covers the evening peak and the early hours, and firm generation fills the pre-dawn gap.
Originated directly with the customer and structured by Joule NRG. Designed, built and operated in association with AGL.
No viable grid connection. Diesel irrigation replaced, with diesel use down around 85%.
AGL project pageUnderground powerlines feed the pumping stations directly. Around 7,000 tonnes of Scope 1 emissions removed a year.
AGL news releaseGrid-connected, reaching around 83% renewable penetration, with market participation upside shared with the customer.
pv magazine AustraliaSouth Australia's largest almond orchard, and among the largest privately owned non-mining microgrids in the country.
pv magazine AustraliaHigh consumption, land for generation, a constrained grid, and a load driven by process rather than occupancy. Agriculture proved it. The conditions hold well beyond it.
5–50 GWh a year · seasonal pumping, remote sites, heavy diesel
20–120 GWh a year · continuous load, weak or absent connection
10–50 GWh a year · steady process load, decarbonisation pressure
5–70 GWh a year · long tenure, schedulable load
Twelve months of interval data and a site plan. First-pass energy balance and indicative PPA range in days, at no cost.